Zakopane 05.2023-09.2025 – Construction and Modernization of the Stadium on Orkana Street
Construction of the Funicular Railway at the Wisła Malinka Ski Jumping Hill
Reconstruction of the landing hill of the K-120 Wisła Malinka Ski Jumping Hill
Nowy Targ 08.2023-05.2024 – Construction of the Waste Sorting Hall
Nowy Targ 11.2022 – Construction of a rainwater infiltration tank at the Waste Sorting Plant
Nowy Targ 03.2022-07.2022 – Construction of a storm sewer system at the Waste Sorting Plant
Szczyrk 11-2022 do 12-2022 – Reconstruction of the K-40 ski jump inrun and installation of a track freezing system at the Skalite Ski Jumping Hill
Trondheim 09.2022 – Installation of the landing hill surface for K 125 and K 95 ski jumps
Zakopane 11/2021-06/2022 – Reconstruction of tennis courts at COS OPO Zakopane
Mo i Rana (Norway) 09-2021 – Installation of the landing hill surface for K 15, K 25, K 45, K 70, and K 95 ski jumps
Średnia Krokiew 05-2019 to 06-2021 – Reconstruction of a complex of 5 ski jumps along with a cable car
Development of the concept of a Protective Tunnel on the inrun of a ski jump – Made in cooperation with the design office Archigeum Sp. z o.o.
Development of the concept for the reconstruction of the Harrachov Czachy ski jumping center - carried out in cooperation with the design office Archigeum Sp. z o.o.
Szczyrk 11-2020 do 12-2020 – Reconstruction of the K-70 ski jump inrun and installation of a track freezing system at the Skalite Ski Jumping Hill
Chochołów 11-2017 to 11-2018 – Construction of K25 and K35 ski jumps
Wielka Krokiew 05-2017 to 11-2017 – Reconstruction of the landing hill of the Wielka Krokiew ski jump
Bystra Śląska 05-2010 to 08-2010 – Construction of a complex of K25 and K35 ski jumps
Wisła Malinka 2008 – Construction of the landing hill of the K120 ski jump – Wisła Malinka
Zakopane 2008 – Construction of the chairliftr at the Wielka Krokiew Ski Jumping Hill
